By Energy People.
ACME Solar’s subsidiary ACME Alpha Renewables has signed a 150MW hybrid power purchase agreement with NTPC, securing a 25-year sales arrangement from the scheduled supply start of 30 June 2028.
The company’s 18 November stock-exchange filing sets the tariff at ₹3.21 per kilowatt-hour under NTPC’s Hybrid-IV tranche. The 150MW figure is contracted supply capacity, rather than a disclosed total of installed solar panels, wind turbines and batteries.
The development will combine solar, wind and energy storage across Bhadla in Rajasthan, Jambkhabalia in Gujarat and Mandsaur in Madhya Pradesh. ACME did not give separate generation capacities or battery duration for the components.
ACME said the Central Electricity Regulatory Commission has adopted the tariff and that transmission connectivity has been secured for Jambkhabalia and Mandsaur.
The agreement provides a long-term route to market for the hybrid project. Its stated aim is to match renewable supply to the buyer’s needs, including peak-demand periods; the filing does not announce a commercial operating start.
Source: ACME’s 18 November exchange filing and accompanying release
Image credit: Illustrative location and technology file photograph: solar panels in the Thar Desert, Rajasthan, India, 22 November 2019; not ACME’s contracted hybrid project. Ji-Elle / Wikimedia Commons, CC BY-SA 4.0. Resized.
Explore this story
Companies mentioned
- Route to Market · Live jobs · Projects · News

