Language / اللغة

Avantus signs PG&E deals for 800MW solar and 3.2GWh storage

Solar panels at Double Black Diamond solar farm beside a rural Illinois road

By Energy People.

Avantus has signed 20-year power purchase agreements with Pacific Gas and Electric for 800MW of solar generation and 3,200MWh of battery storage at the first two phases of its Buttonbush Solar Center in California.

The agreements for Buttonbush 1A and 1B, announced on 17 November, still require California Public Utilities Commission approval. They are not confirmation that construction or electricity supply has started.

Avantus expects construction in western Kern County to begin in 2027 and commercial operations in 2029. It plans to own and operate both projects.

The developer estimates a US$3 billion infrastructure investment and approximately 900 union construction jobs, alongside permanent operations and maintenance roles. Those figures are company projections; the announcement does not specify the number of permanent posts.

The proposed facilities would occupy water-stressed farmland under long-term leases. Combining solar with storage would allow some daytime output to be delivered later, including during evening demand.

Source: Avantus’s 17 November announcement, including the CPUC approval condition.

Image credit: Illustrative US solar-sector file photograph: part of Double Black Diamond solar farm, Talkington Township, Illinois, 6 June 2026; not Buttonbush or California. Visviva / Wikimedia Commons, CC BY-SA 4.0. Resized and converted to WebP; same licence retained.

Explore Solar jobs.

Share this article
EmailWhatsAppLinkedInFacebookX