Language / اللغة

NAC signs contract for Norway’s spent-fuel storage system

Close-up of metallic equipment inside the Halden research reactor in Norway

Norwegian Nuclear Decommissioning, the Institute for Energy Technology and NAC International signed a contract on 4 November for a new system to store Norway’s used nuclear fuel.

The agreement is intended to enable fuel to leave existing stores and support dismantling of the former nuclear facilities. NND says the system uses stainless-steel fuel containers inside protective concrete silos; transport would use a separate container.

NAC will now work with the Norwegian organisations on design, analysis and safety documentation. It envisages 22 months of development, with the start dependent on a security agreement. Documentation must then go through review and submission to the authorities.

The system is designed for more than 70 years of passive dry storage. That design life does not set how long fuel will remain at a particular location. Fuel movements associated with NND’s separate treatment agreement with Studsvik also require permits and approvals.

The announcement does not specify the contract value or final number of silos. It marks a procurement step, rather than approval to begin moving fuel.

Source: NND, 4 November 2026. Explore NAC International’s employer profile and nuclear jobs.

File photograph: equipment inside the Halden research reactor, Norway. Capture date not independently confirmed; this does not show the newly contracted storage silos. Jan Johannessen / NND, official press photograph, permitted for reuse with photographer credit. Resized and compressed.

Compiled by Energy People with AI assistance from linked sources.

Share this article
EmailWhatsAppLinkedInFacebookX