Enova has awarded NOK3.94 billion to two floating offshore wind demonstration projects, the Norwegian state agency announced on 30 October. Fortius Offshore Wind is allocated NOK2 billion and Fram Wind Solutions NOK1.94 billion.
Each developer plans two 18.5MW turbines at METCentre’s demonstration area off Karmøy in Rogaland within the next five years. That gives the four turbines a combined proposed capacity of 74MW.
Enova says support will be paid if the projects are implemented. It forecasts combined generation of 300 million kilowatt-hours annually, equivalent to 0.3TWh; this is expected output rather than operating generation.
The demonstrations will test floating foundations, mooring arrangements, construction methods and operation of large turbines. These are practical cost-reduction challenges for marine contractors and offshore suppliers as floating wind moves towards wider commercial deployment.
Source: Announcement dated 30 October 2026.
Energy People news brief, compiled with AI assistance from linked sources.
Explore the Enova organisation profile.
Explore Wind jobs across the sector.
Illustrative location file photograph: turbines at Storøy wind farm, Karmøy, Norway, 5 August 2021. These existing land-based turbines are not the four proposed floating turbines or the newly funded projects. Photo: Ryan Hodnett / Wikimedia Commons, CC BY-SA 4.0. Resized and compressed; same licence retained. Photograph source; licence.

