South Korea has opened a new offshore-wind auction for approximately 2.2GW, including a dedicated 500MW allocation for floating projects.
The Ministry of Climate, Energy and Environment announced the competition on 30 October, with tender documents published through the Korea Energy Agency. The round adds to approximately 1.8GW offered in the first half, taking this year’s total bidding volume to around 4GW.
Fixed-bottom projects account for about 1.7GW: approximately 1.4GW in the general category and 300MW for publicly led developments. Floating wind has a separate 500MW category.
The ceiling prices are KRW168.937/kWh for fixed-bottom projects and KRW174.003/kWh for floating wind, down 1.34% and 0.63% respectively from the first-half ceilings.
The tender creates opportunities for developers and equipment, vessel and port suppliers, but the announced capacity is available for bidding; it is not a set of awarded contracts or commissioned wind farms.
The ministry is also considering extending fixed-price contracts from 20 to 25 years in the next competition. That possible change is not presented as an adopted term for this round.
Source: South Korean ministry announcement, 30 October 2026 (Korean).
Explore wind-energy jobs.
Image credit: Illustrative offshore-wind technology file photograph: Barrow Offshore Wind Farm, Irish Sea, UK, 19 April 2009. This is not South Korea or a project in the new tender. Andy Dingley; edited by Muhammad Mahdi Karim / Wikimedia Commons, CC BY-SA 3.0. Resized; same licence retained. Original photograph · CC BY-SA 3.0.
By Energy People — compiled with AI assistance from the linked sources.

