Orlando field development
United Kingdom · Production ceased; later decommissioning scope partly reviewed
Single-well tieback to CNRI-operated Ninian Central, about 11 km away, in block 3/3b and licence P.1606. Development approval in 2012/2013 and construction in 2018/2019 preceded first oil in 2019. May 2026 consultation draft and checked asset page forecast cessation in H1 2027. The dated 6 August 2026 results supersede that forecast: production stopped in May following pump failure, with no remedial restart planned. Decommissioning and well abandonment preparation follows; actual completion dates and awards unverified.
Companies and live jobs
These are the participating companies’ vacancies across their businesses; a project appointment does not establish that every vacancy is for this project.
- Serica Energy · Live jobs · Projects
Serica 100% and operator; Serica Energy Chinook Limited identified as legal operator in May 2026 assessment.
Project evidence
- Orlando consultation draft; not approval
- Serica asset page retains H1 2027 cessation forecast
- Serica interim results supersede Orlando closure forecast