Dogger Bank A, B and C
Three offshore wind phases are being developed as a single programme. SSE leads construction and Equinor is the designated operator after completion.
- Location
- North Sea, 130–190 km off north-east England
- Project stage
- Under construction
- Capacity
- 3.6 GW planned total; 1.2 GW per phase
- Milestone
- Development and construction ongoing; completion date not asserted here.
- Record checked
- 2026-10-26
Project organisations
SSE (40%) · Equinor (40%) · Vårgrønn (20%)
Contractors and work packages
- GE Vernova — Turbines (package source)
- Jan De Nul — Turbine transport and installation (package source)
- Sif / Smulders — Monopiles and transition pieces (package source)
- Seaway7 — Foundation installation (package source)
- Saipem — A/B platform installation (package source)
- Heerema — C platform installation (package source)
- DEME — Inter-array cables (package source)
- NKT — Export cables (package source)
- Aibel — Offshore platforms (package source)
- Hitachi Energy — HVDC equipment (package source)
- North Star Renewables — Service vessels (package source)
- Jones Bros — Onshore civils (package source)
- Murphys — C export-cable civils, shared with Sofia (package source)
- Port of Tyne — Operations base (package source)
- Bowmer & Kirkland — Operations-base construction (package source)
- Granada Material Handling — 200+ cranes (package source)
Supplier opportunities
- Register interest with Dogger Bank Project supplier-interest registration; contractor requirements vary.
Related news
- Reckitt signs ten-year Dogger Bank B power deal for UK operations
- Chubu consortium named preferred bidder for £1bn Dogger Bank B transmission link
- Cadeler secures first Wind Apex deployment at Dogger Bank C
- Equinor's Dogger Bank Wind Farm Partially Onstream in the UK